Clinical Guides
What we have learned at the bench, for your chair
20 guides written from real implant and full-arch cases — organized by the stage of treatment.

Planning
Decide the restoration before the first drill.
Guided Surgery
R2 guides, chairside prep and surgical day.
Guided Surgery A to Z — R2GATE & R2Lite
The full computer-guided surgery workflow with an R2 guide.
Chairside Prep — Radiographic Wax Rim & CBCT
Preparing the scan appliance and taking the CBCT.
R2Lite — Setup, Icons & Approval
Reviewing and approving the surgical plan in R2Lite.
Surgery Day — Check Points to 1-Day Temporization
Guide fitting, drilling protocol, fixture delivery and same-day provisional.
Manually Guided Surgery — Surgical Stent
Using a conventional surgical stent when a digital guide is not used.
Immediate Conversion with MUA
Converting a denture to a fixed provisional on multi-unit abutments.
Impression & Scan
Records that let us fit it the first time.
Pickup Impression — Open Tray
Capturing implant positions accurately with an open-tray pickup.
Closed Tray vs. Open Tray
Which technique to choose, and the errors each one invites.
Impression Errors — How to Fix
Reading a failed impression and what to redo.
Intraoral Scan → 3D Printed Model → Custom Abutment & Zirconia
The fully digital path from scan to final crown.
Try-in & Delivery
Verify, adjust and seat.
Protocols by Restoration
Step-by-step for each full-arch option.
Full Mouth — General Protocol
Appointment-by-appointment sequence for a full-mouth implant case.
Hybrid Bar & Denture
Records and try-ins for a hybrid bar prosthesis.
Full Arch Zirconia
From provisional to final monolithic zirconia arch.
Locator Overdenture
Attachment selection and pickup for a Locator overdenture.
Full Denture — Standard Procedure
Our standard sequence for conventional full dentures.